STEP 1:
STEP 2:
STEP 3:
STEP 4:
BRING ENGINE UP TO NORMAL OPERATION TEMPERATURES, THEN SHUT OFF ENGINE
WITH THE ENGINE OFF, ADD TO THE ENGINE THROUGH OIL PORT
IMMEDIATELY START ENGINE AFTER ADDING THE PRODUCT
REV THE ENGINE TO 1500 RPM FOR 2 MINUTES TO ENSURE FULL CIRCULATION.
IMMEDIATELY DRIVE THE VEHICLE FOR 20 TO 30 MILES.
STEP 5:
NOTE: CERASEAL PRO™ IS HEAVIER IN WEIGHT THAN MOTOR OIL AND MAY SETTLE IN CRANKCASE OIL PAN IF NOT RE-CIRCULATED IMMEDIATELY. IT WILL TAKE MUCH LONGER TO COMPLETE THE CLEANING AND SEALING PROCESSES WILL ENSURE CARBON CLEAN-OUT AND METAL SEALING ARE COMPLETE.
TREATMENT REQUIRES 8 MONTHS TO A YEARLY RE-APPLICATION TO MAINTAIN MAXIMUM PROTECTION.